济南诚耐金属制品有限公司

济南诚耐金属制品有限公司

不断发展技术力量、完善的设计服务团队,真诚为您提供的服务

咨询热线
于经理15194166167
15990909037

联系我们

企业名称:济南诚耐金属制品有限公司

联系人:于经理

电话: 15990909037

电话: 15194166167

地址:山东省济南市历城区小清河南路8288号

当前位置:首页 »资讯中心 » 新闻资讯

门套歪不歪,复尺说了算

来源:https://www.sddtmt.com/ 浏览:0发表时间:2026-11-27

潍坊不少工地装电梯门套,非常后翻车不在板材,而在“贴完砖才叫人量”。瓦工收口一结束,门洞左右墙垛差两三公分、门头压不平、阴阳角不方,门套厂上门只能硬切。切完胶缝越补越宽,远看一条黑线,近看全是补丁。电梯口这圈收边,真不是买块不锈钢包上就完事。

Many construction sites in Weifang install elevator door frames, but in the end, the collapse is not caused by the panels, but by the fact that "the number of people is only after the bricks are pasted". As soon as the bricklayer finished closing, there was a difference of two or three centimeters between the left and right wall piers of the door opening, uneven pressure on the door head, and uneven corners. The door frame factory had to cut hard when it came to the door. After cutting the glue seam, the wider it gets as you fill it up. From a distance, there is a black line, but up close, it is all patches. The edge of the elevator entrance is not just about buying a stainless steel bag.

复尺要卡在“贴砖后、电梯调完前”

The ruler should be stuck after tiling and before the elevator is adjusted

O1CN01GGLqXX1KU4Ywv34va_!!2209449911166-0-cib

顺序错了,后面全被动。正确节点是:

The order is wrong, everything else is passive. The correct node is:

瓷砖/石材贴完、勾缝干透;

After tiling/stone, the joints should be fully dry and pointed;

电梯层门装好、光幕调试完(门套要跟层门边留匀缝);

The elevator landing door is installed and the light curtain is debugged (the door frame should have a uniform gap with the landing door edge);

再叫门套方复尺。

Call the door frame square ruler again.

提前量毛坯尺寸没用,贴砖吃掉多少厚度谁也算不准;太晚量又赶上赶工期,师傅现场切,精度全靠手感。

It's useless to measure the raw material size in advance, no one can predict how much thickness the tiling will consume; Too late to meet the deadline, the master cut on site, and the accuracy depends entirely on the hand feel.

门洞歪了别硬凑对称

The door opening is crooked, don't force it to be symmetrical

左右墙垛差 2–3cm 是常态。处理逻辑不是把门套做歪去迁就墙,而是:

A 2-3cm difference between the left and right wall piers is the norm. The processing logic is not to tilt the door frame to accommodate the wall, but to:

门套本身按层门中心线定位,保证电梯口视觉居中;

The door frame itself is positioned according to the centerline of the floor door to ensure that the elevator entrance is visually centered;

两侧收边条宽度不等时,用可调收口+同色补角消化偏差;

When the width of the edge strips on both sides is not equal, use an adjustable edge closure+same color corner filling to digest the deviation;

门头不平超过 5mm,先做找平衬板(防火木塑或金属衬),别拿结构胶硬垫。

If the unevenness of the door head exceeds 5mm, first make a leveling lining plate (fireproof wood plastic or metal lining), and do not use structural adhesive hard pads.

硬凑对称的结果就是一边胶缝 2mm、一边 8mm,验收一眼就挑出来。

The result of hard fitting symmetry is a glue seam of 2mm on one side and 8mm on the other side, which can be picked out at a glance during inspection.

材质与板厚按场景分,不按“看起来出彩”

Material and plate thickness are classified according to the scene, not according to "look advanced"

住宅公区/回迁房:201 拉丝 1.0–1.2mm,卡扣式装配式,够用不贵;

Residential public area/relocation house: 201 brushed 1.0-1.2mm, snap on assembly type, sufficient and not expensive;

写字楼/酒店电梯厅:304 拉丝或古铜/玫瑰金 1.2–1.5mm,阴阳角折边≥15mm;

Office building/hotel elevator hall: 304 brushed or antique copper/rose gold 1.2-1.5mm, with internal and external corner folded edges ≥ 15mm;

工地临时口/未交付楼:简易 15cm 卡扣款,能拆能复用,别上精装料。

Temporary entrance/undelivered building on construction site: Simple 15cm card deduction payment, can be dismantled and reused, without adding fine decoration materials.

板厚合同写“实测基板厚”,喷塑/镀色层不算;到货卡尺量折边非常薄处,负差超 0.1mm 直接拒。

The thickness contract states' measured substrate thickness', excluding spray coating/color coating; The thinnest part of the folded edge measured by the arrival caliper will be rejected if the negative deviation exceeds 0.1mm.

基层别再用木龙骨老办法

Don't use the old method of wooden keel at the grassroots level anymore

潍坊这边冬天供暖、夏天返潮,木龙骨打底半年就霉、空鼓。装配式门套配防火木塑纤维衬板+专用卡扣,既防火又不吃潮气;已贴砖的口子用防火安装配件找平,比现场打木楔稳得多。阴阳角建议工厂折好,现场只拼不切,毛边概率直接降一个量级。

In Weifang, heating is provided in winter and moisture returns in summer, causing the wooden keel to become moldy and hollow after half a year. Prefabricated door frame with fireproof wood plastic fiber lining board and special buckle, both fireproof and moisture resistant; The joints that have been tiled should be leveled with fireproof installation accessories, which is much more stable than using wooden wedges on site. The internal and external corners must be folded in the factory, and only assembled on site without cutting, reducing the probability of burrs by one order of magnitude.

验收盯四样

Acceptance inspection focuses on four samples

门套中心线与层门中心线偏差 ≤2mm;

The deviation between the centerline of the door frame and the centerline of the floor door is ≤ 2mm;

左右胶缝宽度差 ≤1.5mm,整圈打胶连续无断点;

The width difference between the left and right glue seams is ≤ 1.5mm, and the entire circle of glue is continuously applied without any breaks;

阴阳角拼缝塞尺 ≤0.5mm,手摸无台阶;

Internal and external corner joint plug gauge ≤ 0.5mm, no step when touched by hand;

卡扣敲紧后轻推不晃,收口条不回弹。

The buckle does not shake when lightly pushed, and the closing strip does not rebound.

电梯门套这东西,板材只是面子,复尺节点、偏差消化、基层防火、阴阳角工厂化才是里子。潍坊项目赶工期多,把复尺顺序钉死,比事后补胶省十倍人工。

The elevator door frame, the board is just the face, the key is to scale the nodes, digest deviations, prevent fires at the grassroots level, and industrialize the internal and external corners. The Weifang project has a long deadline, and nailing down the order of re sizing saves ten times more labor than post gluing.

本文由潍坊电梯门套友情奉献.更多有关的知识请点击:http://www.sddtmt.com我们将会对你提出的疑问进行详细的解答,欢迎你登录网站留言.

This article is a friendly contribution from Weifang Elevator Door Frame For more information, please click: http://www.sddtmt.com We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

下一篇:线板歪两毫米,整面墙显廉价上一篇: