贴砖后才叫量尺

来源:http://www.sddtmt.com/ 浏览:0发表时间:2026-11-16

临沂新盘交付集中,电梯门套上门安装非常常见的矛盾是:瓦工贴完瓷砖、电梯调完光幕,门套厂才接到电话。这时候门洞左右墙垛差两三公分、门头不平、阴阳角不方,师傅上门只能现场硬切,切完胶缝越补越宽,业主觉得"做工糙",其实是顺序就错了。

The most common contradiction in the on-site installation of elevator door frames during the centralized delivery of new properties in Linyi is that the door frame factory only receives a call after the tile workers have pasted the tiles and the elevator has adjusted the light curtain. At this point, there is a difference of two or three centimeters between the left and right wall piers of the door opening, the door head is uneven, and the internal and external corners are not square. The master can only cut it hard on site, and after cutting, the glue seam becomes wider and wider. The owner feels that the "workmanship is rough", but in fact, the order is wrong.

O1CN01GGLqXX1KU4Ywv34va_!!2209449911166-0-cib

正确顺序:土建毛洞先复尺,门套厂按净洞预制,再贴砖收口。但既然多数工地已经贴完砖,现场安装就得按纠偏逻辑走。

Correct sequence: The civil engineering rough hole should be re measured first, and the door frame factory should prefabricate it according to the clean hole, and then tile and seal it. But since most construction sites have already finished tiling, on-site installation must follow the correction logic.

上门第一件事不是搬材料,是激光仪复尺。净宽上中下三点取非常小,净高左右中取非常小,墙厚两侧多点测,对角线误差超3mm门套装完必显歪,电梯门框完成面留5–10mm间隙,不蹭门扇不挡光幕。这些数据不测就下单,板子到现场对不上就是返工。

The first thing to do when visiting is not to move materials, but to re measure the laser instrument. The minimum net width is taken from the upper, middle, lower, and left points, and the minimum net height is taken from the left, middle, and right points. Multiple measurements are taken on both sides of the wall thickness, and if the diagonal error exceeds 3mm, the door will appear crooked after installation. Leave a gap of 5-10mm on the finished surface of the elevator door frame, and do not rub against the door leaf or block the light curtain. If these data are not accurate, placing an order will result in rework if the board does not match on site.

贴砖面不等于平整。2米靠尺查,误差超3mm先局部找平再装。混凝土墙打膨胀螺栓固定角码;轻体墙预埋镀锌钢板或轻钢龙骨,不能只靠结构胶粘;地下车库、连廊等潮位环境基层加防潮板,不用木工板打底;阴阳角不方先修角再装套,别靠金属线条硬掰,掰完应力释放会翘边。

The tiling surface is not equal to flatness. Check with a 2-meter ruler, if the error exceeds 3mm, first level the local area before installation. Install expansion bolts to fix corner brackets on concrete walls; Pre embedded galvanized steel sheet or light steel keel for lightweight walls cannot rely solely on structural adhesive; Add moisture-proof boards to the base of tidal level environments such as underground garages and corridors, without the need for wooden boards as a base; If the yin-yang angle is not square, first repair the angle before installing the sleeve. Do not rely on metal lines to break it hard, as the stress released after breaking will cause the edge to curl.

装配式不锈钢门套主流做法:工厂折弯一体成型,现场干挂。竖板压门头横板,门头条宽比竖料窄1–2mm,拼角层次感更好;背后点涂中性硅酮结构胶间距均匀,边缘留胶位;高度超1.5米加暗挂件或干挂角码,不靠胶承重;自攻螺丝不锈钢材质,钉距≤300mm,钉头沉入板面用同色胶盖;拼缝留1.5mm左右打同色耐候胶,胶缝饱满不顺手抹。

The mainstream method for prefabricated stainless steel door frames is factory bending and integrated molding, and on-site dry hanging. Vertical plate pressing the door head horizontal plate, the width of the door head strip is 1-2mm narrower than the vertical material, and the joint angle has a better sense of hierarchy; Apply neutral silicone structural adhesive evenly on the back, leaving adhesive space at the edges; If the height exceeds 1.5 meters, add concealed hangers or dry hanging corner codes, and do not rely on adhesive for load-bearing; Self tapping screws made of stainless steel material, with a nail spacing of ≤ 300mm, and the nail head sinking into the board surface covered with the same color adhesive; Leave about 1.5mm at the joint and apply weather resistant adhesive of the same color. The adhesive joint should be full and not easy to apply.

收口是区分"能看"和"像精装"的关键。门套侧边留5mm压边压在瓷砖面上,墙面误差被盖掉;与电梯门框之间缝均匀,不遮安全触板不挡光幕感应区;底部离地完成面留5mm伸缩缝打胶防潮,不贴死地面;拼角优先工厂45°折弯一体成型,现场不焊接不现切,切完必有接痕。

Closing the mouth is the key to distinguishing between "good-looking" and "like hardcover". Leave a 5mm edge on the side of the door frame and press it against the ceramic tile surface, covering the wall error; The gap between the elevator door frame is uniform, without covering the safety touch panel or blocking the light curtain sensing area; Leave a 5mm expansion joint at the bottom off the finished surface and apply glue to prevent moisture, without sticking to the ground; Priority is given to factory 45 ° bending and integrated molding for corner splicing. No welding or cutting is required on site, and there must be joint marks after cutting.

验收当场看五点:2米靠尺查垂直度偏差≤2mm、对角线误差≤3mm、拼缝高低差≤0.3mm无错台、手推门套无松动无空鼓声、保护膜装完24小时再撕不提前揭。

On site inspection of five points: a 2-meter ruler should be used to check for verticality deviation of ≤ 2mm, diagonal error of ≤ 3mm, joint height difference of ≤ 0.3mm, no wrong platform, no looseness or hollow drum sound in the manually pushed door frame, and the protective film should not be removed in advance after 24 hours of installation.

电梯门套上门安装不是"量个数把板贴上墙"。贴砖后的门洞已经定型,师傅的价值是把墙的不方正用基层找平、压边收口、干挂微调消化掉。量尺省一步,后面一圈胶都救不回那条歪缝。

The installation of elevator door frames on the door is not about "measuring the number of panels and pasting them on the wall". The door opening after tiling has been finalized, and the value of the master is to level the unevenness of the wall with the base layer, press the edges and close the mouth, and fine tune and digest the dry hanging. Measuring with a ruler saves one step, even a circle of glue behind cannot save the crooked seam.

下一篇:定制门套量尺顺序上一篇: